What's New? - Passed the WAN interface tests at the IHE Korea Connectathon

H3 manager passed the WAN interface tests at the IHE Korea connectathon 2010.

The Korea connectathon 2010 was held on the 23-26 of August, 2010 in Daegu, Korea. The event was an intensive four-day marathon focusing on electronic health record system connectivity and interoperable exchange of patient health data with standard-based systems.

At the IHE Korea connectathon 2010, H3 System brought a H3 manager handling data transmission based on IEEE 11073. The test scope was on WAN interface. (Agent-Manager-Server)

The detailed spec is as below.

1. Agent (Devices)
  - A&D Continua certified blood pressure monitor
  - A&D Continua certified weight scale
  - Allmedicus’ glucometer

2. Bluetooth-HDP
  - Stollmann’s USB type Bluetooth-HDP dongle

3. Manager
  - OS: MS Windows
  - PCD-01 over Web service

The IHE Korea connectathon 2010 is the first official test about PHD data transmission over WAN interface. So it gave a good effect on H3 System, because the spec. of the WAN interface at IHE connectathon 2010 is very similar to Continua WAN interface.  

At the IHE Korea connection 2010, our successful test result gave a good meaning to Korea’s healthcare industry. And it is also expected that we will have more development in standard-based system.

'1' Trackbacks

-

Time :
()

-

Time :
()

-

Time :
()

List of Articles
No. Subject Author Date Viewssort
24 H3 SYSTEM, 'ATA 2012 in San Jose' [1] file H3System Apr 27, 2012 1367265
23 H3 System Heart Rate Monitor Demo Video [3] H3System Apr 07, 2011 680143
22 Become a member of IHE (Integrating the Healthcare Enterprise) [99] file H3System Apr 07, 2011 337115
» Passed the WAN interface tests at the IHE Korea Connectathon [1] file H3System Apr 07, 2011 279228
20 ATA 2009(14th Annual International Meeting of American Telemedicine Association 2009) [2] file H3System Apr 07, 2011 267401
19 Participation in MEDICA 2010 [127] file H3System Apr 07, 2011 249780
18 MEDICA 2004 with GlucoAutoCheck [2] file H3System Apr 07, 2011 237476
17 Participation in the HIMSS Interoperability Showcase in Oct. 2010 [183] file H3System Apr 07, 2011 227102
16 H3 System Tele-Healthcare Solution Demo Video [5] H3System May 11, 2011 224583
15 We joined the Continua Health Alliance in February, 2009 [1] file H3System Apr 07, 2011 200013
14 MEDICA 2008 with GlucoAutoCheck and Wearable Pulse Sensor [90] file H3System Apr 07, 2011 188677
13 MEDICA 2009 with Tele-Healthcare Solution and Wearable Heart Rate Monitor [209] file H3System Apr 07, 2011 180172
12 H3 System, ‘ATA 2010 in San Antonio’ [104] file H3System Apr 07, 2011 176179
11 IT Convergence KOREA 2009 [228] file H3System Apr 07, 2011 169590
10 MEDICA 2005 with GlucoAutoCheck [92] file H3System Apr 07, 2011 158802
9 MEDICA 2007 with GlucoAutoCheck and Wearable Pulse Sensor [1] file H3System Apr 07, 2011 152124
8 [Selected for participation in MEDICA 2012] H3SYSTEM is chosen to be funded by Global New Market Frontier Business, contracted in 4th October 2012 H3System Dec 17, 2012 125323
7 Participation in Continua Fall Summit & Plug Fest (Singapore) H3System Dec 26, 2011 88936
6 [TTA Certification Best Award] The top prize to H3SYSTEM ‘U-HEALTH CARE GATEWAY’ file H3System Dec 17, 2012 80036
5 [Verizon IOT] CDMA Gateway (H3G-650) passed U.S. Verizon IOT. 2nd August 201 H3System Dec 17, 2012 64927

News